t. +44 (0)20 7939 0920 | e. contact@dhadesigns.com
The challenge of the project was that we only had 36 (long) hours on site from the final Opera House’s performance to the opening of the exhibition to coincide with the Olympic Opening Ceremony. DHA Designs worked closely with Hypsos in Holland to pre-programme as much as possible prior to the installation, and took a hands-on approach to get the project opened on time
Client